Seewinkeltherme, Frauenkirchen, Austria. Structural work in record time: Short construction period for large-scale project

Saturday, November 8th 2008

The Austrian Seewinkel hot springs resort complete with four-star hotel is currently one of the largest reinforced concrete construction projects in the Alpine Republic with a total investment in the region of 80 million euros. The HABAU group of companies were commissioned to construct the concrete frame and in so doing have succeeded in meeting two difficult challenges. On the one hand, the special form of the spiral-shaped building with mostly... 

Sportarena Lora, Split, Croatia. Shoring and assembly platform for 180-tonne roof girder

Thursday, August 7th 2008

The almost 80 metre long and 5.40 metre high truss girders made of steel form the basic construction for the roofing of the new multi-functional hall in the Croatian city of Split. Each of the main constructional elements – the up to three metre wide pairs of trusses – weighs a massive 180 tonnes. In order to be able to cost-effectively assemble the roof, consisting of eight such gigantic components, contractors Dinarik, in co-operation with... 

Load Arrestor ensures safety of machinery and equipment.

Thursday, January 11th 2007

PROTECTA, the world’s leading manufacturer solely dedicated in providing the best in fundamental fall protection has announced the launch of their NEW Load Arrestor. PROTECTA’s new Load Arrestor model number AD412/300 has been modelled on the popular compact, lightweight and durable JRG range of self retracting lifelines. The Load Arrestor has been engineered as a back up safety device to completely stop a dropping load (material loads...