Filadelfie Administration Building, Prague, Czech Republic

Sunday, February 7th 2010
Filadelfie Administration Building, Prague, Czech Republic

The structural work for the Filadelfie building complex in Prague with its interesting ground plan is very close to completion. With the help of the PERI formwork solution, the 17-floor multi-storey building – constructed in the form of a four-blade propeller – will shortly be finished. The MULTIFLEX slab formwork system, in particular, showed itself to be extremely flexible and adaptable for forming the curved upper and massive basement slabs. Comprehensive... 

Two Villas Koseze by Sadar Vuga Arhitekti

Sunday, March 22nd 2009
Two Villas Koseze by Sadar Vuga Arhitekti

The two houses are conceived so that despite their respective different positions that influence their natural lighting as well as their boundary conditions and associations with the neighbors, the two proprietors’ residential circumstances are as similar as possible and enjoyable throughout the year. For this reason, the houses are varied as corresponding to their position, which also contributes to their identification. The complex is closed towards... 

Seewinkeltherme, Frauenkirchen, Austria. Structural work in record time: Short construction period for large-scale project

Saturday, November 8th 2008

The Austrian Seewinkel hot springs resort complete with four-star hotel is currently one of the largest reinforced concrete construction projects in the Alpine Republic with a total investment in the region of 80 million euros. The HABAU group of companies were commissioned to construct the concrete frame and in so doing have succeeded in meeting two difficult challenges. On the one hand, the special form of the spiral-shaped building with mostly... 

‘SmartParts’ for Flovent software

Thursday, March 15th 2007

Flomerics has announced the availability of six new ‘SmartParts’ for Flovent software that save time and improve accuracy in simulating the performance of diffusers. In the past, modeling diffusers has required detailed information from manufacturers about physical tests, building a room model to simulate the tests, and adjusting the model to match the test results. The new SmartParts models, on the other hand, can simply be dropped into...