
Just 10 months since breaking ground on the Inner Harbor Navigation Canal (IHNC) Surge Barrier project, The Shaw Group Inc. (NYSE: SHAW) has completed a major phase of construction on Lake Borgne near New Orleans, driving the final 66-inch diameter, 144-foot-long vertical pile on the foundation of the world’s largest storm surge barrier on Oct. 21, 2009. The two-mile floodwall, designed as part of a system to provide 100-year-level storm protection...