In Weekly Cycles: Apartment Walls and Slabs in Fair-faced Concrete Quality

In Weekly Cycles: Apartment Walls and Slabs in Fair-faced Concrete Quality

With the PERI GRIDFLEX, the construction crew can achieve fast shuttering times and evenly formed ceilings. The freely-selectable formlining can be safely installed on the element girder grid., Picture Size: 709 x 472,

In Weekly Cycles: Apartment Walls and Slabs in Fair-faced Concrete Quality Pictures

The MaxHaus Morumbi in São Paulo consists of four residential towers each with eight storeys. In addition to PERI climbing formwork with VARIO and CB, GRIDFLEX aluminium grid slab formwork is being used for the first time in Brazil. With the PERI GRIDFLEX, the construction crew can achieve fast shuttering times and evenly formed ceilings. The freely-selectable formlining can be safely installed on the element girder grid. Maximum flexibility with telescoped GRIDFLEX filler elements for easy and simple adjustments in both longitudinal and lateral directions. PERI VARIO girder wall formwork and the CB climbing system form crane-moveable climbing units for the external walls. With on-site formwork requirements for the shaft and installation walls being halved, the construction team are still in a position to achieve the planned weekly cycle.
Return to article